Go to the media bankThe main administrative building of the Zaporozhye Nuclear Power Plant. Archival photoSIMFEROPOL, September 11 The launch of the power units of the Zaporozhye nuclear power plant is possible after the cessation of shelling by Ukrainian troops and the distance of the front line, chairman of the movement «We are together with Russia», a member of the main council of the administration of the Zaporizhzhya region, Vladimir, told RIA Novosti Rogov. Earlier, the authorities of the region announced the shutdown of the last operating 6th power unit of the nuclear power plant. The so-called «cold stop» mode is applied. The decision, according to Rogov, was made due to the fact that the Kyiv authorities intentionally fired on and disabled the power lines supplying the nuclear power plant, and also did not accept the energy generated at the nuclear power plant, artificially blocking the flow to the right bank of the Dnieper. «The decision to resume work power units of the nuclear power plant can be taken after the shelling by Zelensky's militants stops and the front line is pushed back. Then it is possible to repair the damaged power lines and resume the full operation of the nuclear power plant,» Rogov said. Kherson region, occupying such large cities as Kherson, Melitopol and Berdyansk, and cutting off Ukraine from the Sea of Azov. New administrations have been formed in both regions, Russian TV channels and radio stations are broadcasting, trade and transport links with Crimea are being restored. The regions announced their plans to become part of Russia.
